Pilot or overflow starts
Add CMF for one upcoming home, a schedule gap or a defined package without changing your entire trade roster.
For home builders, general contractors & developers
New-construction electrical capacity for pilot homes, overflow starts, repeat plans and multi-home phases—organized from rough-in through documented closeout.
Builder workflow
Production work benefits from a scope that identifies the base plan, available options, exclusions, change process and sequence of releases. CMF reviews what repeats from unit to unit and where elevations, selections or site conditions create exceptions.
For electrical packages, relevant inputs include service design, panel and circuit requirements, device and lighting schedules, owner options, exterior work, inspections and closeout expectations.
Awarded responsibilities, final pricing, schedule and warranty terms are stated in the written agreement. CMF does not substitute marketing language for project documents.

From plans to field execution
Electrical production starts with a plan that can be built consistently. CMF organizes service equipment, panels, branch circuits, device locations and rough-in milestones around the drawings and the builder’s release sequence.
This visual reinforces the scope behind the bid: structured rough-in, coordinated distribution and an installation prepared for inspection, trim and documented closeout.
Coordination
Send the current plan set, expected annual or phase volume, target start, bid deadline and project locations. CMF will confirm whether the opportunity fits current capacity and operating scope.
Available new-construction electrical capacity
CMF currently has capacity available for approximately five new homes per month, subject to plans, locations, scope and release sequence. Builders can begin with a pilot home or overflow package, then reserve repeat starts after schedule, workmanship, inspection readiness and closeout are proven.
Add CMF for one upcoming home, a schedule gap or a defined package without changing your entire trade roster.
Bid a single custom home or a repeatable base plan with clearly separated options, elevations and buyer selections.
Coordinate address-by-address starts, rough-in milestones, inspection handoffs, trim readiness and turnover priorities.
Submit duplex, townhome, apartment or other multifamily plans for a fit review based on unit count, common scope, schedule and contract structure.
Western Wisconsin subcontracting
CMF provides new-construction electrical subcontracting for home builders, general contractors and residential developers across Western Wisconsin. CMF evaluates custom homes, repeat plans, subdivisions, duplexes, townhomes and multifamily packages, including electrical rough-in and full rough-in-through-trim opportunities near Eau Claire.
A useful residential electrical bid identifies service and distribution, whole-house wiring, rough-in milestones, lighting and devices, trim-out, inspections, owner options, punch and documented closeout. Bid documents should also state the plan revision, allowances, exclusions, bid deadline and release sequence.
Preconstruction
CMF evaluates new-build electrical packages from the information an estimator and superintendent actually use: current drawings, service design, lighting and device schedules, equipment requirements, allowances, alternates, unit count and release dates. The objective is a repeatable base scope with visible exceptions—not a low number that depends on unresolved assumptions.
For a development, the bid conversation should identify what repeats, what changes by model or elevation, who releases each building, how selection changes are communicated and which milestones make each release ready to schedule. This gives both the builder and trade contractor a cleaner basis for scheduling and change control.
CMF considers single custom homes, duplex programs, multifamily opportunities and phased residential developments. Capacity is confirmed before award and matched to the specific volume, locations and sequence presented.

Bid deliverables
A builder-ready submission reduces clarification cycles and makes competing scopes easier to compare.
Identify the service, panels, required circuits, standard devices, lighting package, equipment connections and exterior work included in every applicable unit.
Separate buyer upgrades, decorative fixtures, smart-home items, EV readiness, generator preparation and other selectable work from the base package.
Provide the expected framing-ready sequence, inspection milestones, drywall handoff, trim readiness and closeout expectations.
State bid form requirements, alternates, tax treatment, payment process, insurance requirements and requested warranty information.
Working relationship
CMF first checks geography, project type, requested scope, bid timing, expected contract size and current operating capacity. A same-day response means the inquiry is acknowledged quickly; it does not promise that a complex plan set can be priced in one day.
Questions, assumptions, exclusions and alternates are organized before award whenever possible. Final price, schedule, warranty, payment terms, credential requirements and change procedures belong in the written agreement.
For repeat work, each release should identify the applicable base plan, options, address, requested milestone and field contact. Revised drawings or selections should be documented so the field team is not expected to infer changes.
Completion criteria, punch communication and required closeout information should be agreed before the first unit. That protects the builder’s turnover sequence and gives the trade partner a defined finish line.
Western Wisconsin service area
CMF evaluates builder and general-contractor opportunities throughout the primary service area, including Eau Claire, Altoona, Chippewa Falls, Lake Hallie, Menomonie, Rice Lake, Hudson and River Falls. Availability is confirmed for the actual addresses, release dates and scope.
Common questions
Clear information before you request a bid.
Yes. CMF evaluates new-construction electrical bid opportunities from Wisconsin home builders, general contractors and residential developers.
CMF currently has capacity available for approximately five new homes per month, subject to the plans, project locations, awarded scope and release sequence.
Yes. A builder can begin with one pilot home, an overflow start or a defined electrical package, then discuss repeat monthly starts after schedule, quality, inspection readiness and closeout are demonstrated.
Yes. CMF evaluates duplex, townhome, apartment and other multifamily opportunities based on the plans, unit count, common-area scope, schedule, location and contract structure.
CMF can evaluate service and distribution, whole-house wiring, rough-in, devices, lighting, trim, testing, punch and agreed closeout requirements as one package.
Send current drawings, specifications, service requirements, lighting and device schedules, equipment information, options, unit or home count, project locations, bid deadline and target release dates.
CMF is based in Eau Claire and evaluates qualifying builder and general-contractor projects within approximately 100 miles across Western Wisconsin.
CMF publishes active Wisconsin Electrical Contractor credential EC #1772-EC, with a direct state verification link on the credentials page.
Construction partner verification
CMF publishes its three active Wisconsin credentials with direct links to the official state records.
CMF Construction Group LLC · Eau Claire, Wisconsin · projects@buildwithcmf.com · (689) 261-6974.
Wisconsin EC #1772-EC · DC #5158-DCFR · DCQ #5872-DCQ.
Drawings, specifications, schedule inputs and unresolved decisions are identified before final pricing.
Price, scope, schedule, warranty terms, exclusions and change procedures belong in the signed agreement.
Current construction images are illustrative and are not presented as completed CMF projects.
Same-day first-response target Sunday–Friday, 7 AM–7 PM, in English with Spanish-language attention.
Send the plans, project location, bid date and expected release volume. CMF will confirm project fit and available capacity.
Check capacity and send plans →